Protecting your project and the local environment
If you want to carry out a building project you’ll have to make sure that ‘the proposed works will have considered and will not adversely impact the existing biodiversity at or near the site being developed.’ This is a mandatory requirement of the planning process and must be considered at the planning stage.
It is therefore important to identify any issues in relation to the local ecology as early in your project as possible. Then, if any do arise, they can be included at the start of the design process and before the planning application is submitted.
If you don’t, the local authority may refuse to grant planning permission until you have adapted the plans to protect the local ecology.
We include ecology surveys as part of our complete service. We carry them out at the start of the project so we can consider any relevant findings as part of the design process. If necessary, we’ll also apply for a protected species licence so your project can proceed.
Because we co-ordinate everything into one design and planning process, you can avoid any unnecessary delays to your project.
We provide the following ecology surveys:
Received fantastic service from the moment Helen called up. I was told by the Planning Department that I needed a Bat Scoping Survey, but that it was close to the end of the Bat survey season. I did not have a clue what was actually required but Helen took considerable time to talk over everything with me. When I called Helen already had a full diary, but promised to try to fit us in. I had a call the next day with some good news. I cannot believe how much detail goes into the report. Helen was great at communicating with me and I would highly recommend her services.
Mr A.Tucker, LlanelliIn the UK, all bat species, their roosts and breeding sites are protected under the Wildlife and Countryside Act 1981. Bats are also listed under Schedule 2 of the Conservation of Natural Habitats and Species Regulations 2017. This translates the EC Habitats directive (Council directive 92/43/EEC on the conservation of natural habitats and of wild flora and fauna) into UK law.
It means it is a criminal offence to:
You may need a bat survey report and mitigation plan if your works involve demolition, a conversion, alterations (particularly to roof structures), change of use, and the removal of trees and hedgerows. To prevent unnecessary delays, these should be completed before you apply for planning permission. Surveys need to show whether protected species are using the buildings or are present in the area. Mitigation plans will show how the proposed works will accommodate the bats, and avoid, reduce or manage any potential harm to them. A protected species licence will allow the works to be carried out legally.
Bat activity surveys can only be carried out when the bats are active, between May and September. Therefore, if you think you will have to carry out a bat survey as part of your building project, it is important to start planning for this from the start.
We’ll produce a detailed ecology report to submit as part of the planning application, alongside the design drawings. If bats are present we’ll also apply for a European Protected Species Licence. No works on site can start until this has been granted. Therefore, we advise that you ask about a bat survey as early as possible in the planning stages of your project as the overall timescales will depend on what the survey finds.
We also carry out surveys for other rare and protected species. These include great crested newts, pool frogs, badgers, dormice and some birds, in particular during their breeding season.
As with bat surveys, it is important to consider whether your building works will affect any of these species so that any mitigation plans are included in the design and as part of the planning application. We may also need to apply for a European Protected Species Licence.
The planning process requires that any works near trees and hedgerows consider the impact of the works on them.
We carry out tree surveys to BS 5837 to determine which tree species are on your site and any measures needed to protect them from the immediate effects of the building works and the long-term effects of the building itself.
In 2015 we built a new dairy unit to house 200 cattle with a new rapid exit Dairymaster parlour. Mark produced all the plans, drawings and paperwork involved in the planning side of things with Carmarthenshire County Council. He was a great help and took control, therefore taking the stress from us regarding the planning issues. We would highly recommend Mark.
E and C Thomas, CarmarthenI used Helen of H&M Davies to conduct a Bat Survey of our outbuildings for a Planning Application. She was helpful and during the survey explained the requirements and all sorts of useful information about Bats and their habitats. The report was clear and thorough and was happy to address issues raised by NRW and respond to them appropriately, which was much better than the response I wanted to give. I would thoroughly recommend her surveying prowess.
J.G. Philips, CarmarthenI contacted Helen for a Bat report for our property. She was extremely helpful and knew exactly what we needed as this was new to us and our first time dealing with this. She was prompt with the surveys and even accommodated us to produce an urgent Bat report. Very pleased with the service and would highly recommend. Will definitely use again on future properties.
J and J Thomas, Ferryside, CarmarthenshireThe complete design & consultancy service for the construction industry & domestic self-build sector.
Providing services throughout Wales including Carmarthenshire, Ceredigion, Pembrokeshire, Powys, Swansea, Cardiff, Neath and Port Talbot
Home About Services Our Work Contact